Public tenders on e-GP
Bangladeshi public work is tendered on e-GP, with strict document rules and deadlines. Tender documents, deadlines and securities are tracked per bid.
Bangladesh’s project market is led by power and port infrastructure such as Payra and Matarbari, the Padma Bridge and rail links, economic zones around Dhaka and Chattogram, and a large garment and manufacturing factory-building sector. Public works use e-GP tender procedures and measurement-based billing.
Prefer to talk? WhatsApp us or call +91 7600 907 288


Vendor bids, procurement, workshop fabrication and site progress in one system, configured around your own workflow. These are screens from the working product.






Matarbari, Payra and Rooppur power projects involve many packages and long documentation chains. Keep that in spreadsheets and chat groups and every revision, quote and approval ends up in a different place.
| Item Description | Qty | Unit Rate | Total (BDT) |
|---|---|---|---|
| ISMB 350 Beams (50MT) | 50 MT | ৳92,000 | ৳4,600,000 |
| ⚠️ Drawing Rev 4.2 Spec | ??? | Mismatched | #REF! ERROR |
| Anchor Bolts M24 x 600 | 320 Nos | Pending Quote | --- |
Site Engineer • WhatsApp Group
10:42 AM"Hold on! Site team just fabricated off outdated Drawing Rev 3. Procurement never forwarded the updated BOQ!"
Instead of a fixed template, NNT Software maps your approval chain and documents. e-GP tender packages and Measured bills become fields and workflows on the record, so power and energy projects in Bangladesh are tracked from quotation to handover.
Bangladeshi public work is tendered on e-GP, with strict document rules and deadlines. Tender documents, deadlines and securities are tracked per bid.
Factories are built to buyer compliance standards and tight start dates. Civil, structure and MEP packages are linked to the production start date, and inspection records are kept for buyer audits.
Public clients pay on measured bills. Measurements are recorded on the BOQ lines the bill uses and signed on site before submission.
The monsoon slows earthwork and roads. Lost days are recorded per site.
Not just a task tracker. We provide enterprise-grade modules designed specifically to handle the physical and financial realities of construction and fabrication.
Live syncing between engineering drawings and procurement BOQs. Cost impacts are calculated instantly upon any drawing revision.
e-GP tender packages: Bid documents and award records kept against the resulting project.
Learn more →Automate your tender process. Vendors submit quotes directly into your secure portal, and the system generates instant comparison sheets (CS).
Measured bills: Bills prepared from site measurements with retention and deductions shown per bill.
Learn more →Track fabrication progress from raw material to dispatch using barcode scanning on the shop floor. Eliminate lost paper cards.
VAT and AIT fields: VAT and advance income tax fields carried on purchase orders and bills, set up with your accounts team.
Learn more →Remove email bottlenecks. Set up logic-based workflow chains that ping directors on their phones for 1-click financial sign-offs.
Factory build packages: Structural, utility and MEP packages tracked per factory project.
Learn more →Stop building off outdated blueprints. Centralize all drawing revisions with strict version control and instant distribution to site teams.
Learn more →Maximize equipment utilization. Track crane and excavator allocation, fuel logs, and maintenance across multiple sites in real-time.
Learn more →In Bangladesh, project demand comes from power and energy, ports and transport, economic zones and factories, urban construction. The modules are shared; what changes is the sequence of approvals, measurement and billing for each industry.
Design, procurement and site execution on one thread
See the workflow →Job cards, shop floor and dispatch tracked end to end
See the workflow →BOQ, site stores and contractor billing that reconcile
See the workflow →Engagements, timesheets and deliverables billed cleanly
See the workflow →Survey to commissioning milestones, tracked
See the workflow →Maintenance, AMC and asset lifecycle in one register
See the workflow →Packages, inspection records and shutdowns on one traceable thread
See the workflow →Submittals, site stores and subcontractor bills that reconcile
See the workflow →Treatment plants and pipelines tracked from design to trial run
See the workflow →Capital projects and shutdowns planned around material and manpower
See the workflow →Send us your current Excel sheets and approval chain. We will show how it would be set up for your projects.
We deploy tailored modules in weeks, set up around Bangladesh National Building Code (BNBC), Public Procurement Rules and e-GP, RAJUK and local authority approvals.
We map your current Excel/WhatsApp workflow exactly as it is.
We adapt our core framework to match your terminology and phases.
Your team tests a live version with real project data.
Full deployment and training for your engineering teams.
Quality-gated 7-stage process shaped around your exact operational SOPs. Inspect working software continuously and give written sign-off before invoice release.
Zero ambiguity before a single line of code is written.
You only approve and pay when this stage meets 100% of your acceptance criteria.
Traditional tools create data silos, unapproved revisions, and delayed site reconciliations. Here is how engineering firms transform their daily operations.
Manual re-entry when drawings revise. Quantity take-offs get desynchronised and outdated immediately.
Unstandardised quote sheets buried across personal emails and WhatsApp threads. Zero single-source rate history.
Verbal nods, chat messages, and informal emails without a binding sign-off hierarchy or revision timestamp.
Paper job cards and disconnected status reports with no weight verification or milestone links.
Rigid generic SaaS forms or fragile custom Excel formulas that break when teams expand.
Quantities automatically track the current revision baseline with instant differential takeoff logs.
Normalized vendor item rates, commercial evaluation sheets, and locked award records tied to drawings.
Role-based approval gating, digital sign-offs, and immutable audit logs preventing unapproved changes.
Live workshop progress, unit/weight validation, and daily milestone tracking connected to billing.
Configured strictly around your industry phases, nomenclature, and ISO quality standards.
Switching from WhatsApp and Excel to a centralized software is a big leap for any engineering firm. We have compiled the most common concerns about cost, data migration, and field-worker adoption.
Our lead engineers can answer your technical workflow questions directly. No sales pitch, just solutions.
Email usYes. Bills are prepared from measured and approved quantities with retention and deductions shown per bill.
Yes. Each package has its own BOQ, vendor orders and progress under one project.
These can be set up on purchase orders and bills. Final treatment stays with your tax advisers.
Yes. Sites report into one project record regardless of location.
Cities we serve across Bangladesh.
Real feedback from enterprise clients and partners on Google Maps. Hover over any card to pause.
Send us your process or messiest Excel sheet. We'll map it to a custom software architecture for free.
Call Us Directly
+91 7600 907 288Send an Email
[email protected]Office Hours
Mon - Sat: 9:00 AM to 6:00 PM
3rd Floor, Diamond Complex, SH 41,
Industrial Area, Chhapi, Gujarat, 385210