Public procurement and planillas
Ecuadorian public works are tendered through the national system and paid on progress statements (planillas). Statements are drawn from measured quantities.
Ecuador’s engineering work is shaped by oil in the Amazon (Oriente) around Lago Agrio and Coca, the Esmeraldas refinery, large copper and gold mining projects, and industry and port work in Guayaquil. Public projects follow national procurement rules.
Prefer to talk? WhatsApp us or call +91 7600 907 288


Vendor bids, procurement, workshop fabrication and site progress in one system, configured around your own workflow. These are screens from the working product.






Lago Agrio and Coca contractors support well pads and facilities. Keep that in spreadsheets and chat groups and every revision, quote and approval ends up in a different place.
| Item Description | Qty | Unit Rate | Total (USD) |
|---|---|---|---|
| ISMB 350 Beams (50MT) | 50 MT | $780 | $39,000 |
| ⚠️ Drawing Rev 4.2 Spec | ??? | Mismatched | #REF! ERROR |
| Anchor Bolts M24 x 600 | 320 Nos | Pending Quote | --- |
Site Engineer • WhatsApp Group
10:42 AM"Hold on! Site team just fabricated off outdated Drawing Rev 3. Procurement never forwarded the updated BOQ!"
Instead of a fixed template, NNT Software maps your approval chain and documents. SERCOP public tenders and IVA fields become fields and workflows on the record, so oil fields in the oriente projects in Ecuador are tracked from quotation to handover.
Ecuadorian public works are tendered through the national system and paid on progress statements (planillas). Statements are drawn from measured quantities.
Oilfield work in the Amazon needs permits and credentials for every worker and long supply lines. Records are tracked per person and job.
Ecuador’s seismic code requires structural inspection records. Records attach to elements.
Port and packing-plant projects follow harvest and shipping calendars. Plans run back from them.
Not just a task tracker. We provide enterprise-grade modules designed specifically to handle the physical and financial realities of construction and fabrication.
Live syncing between engineering drawings and procurement BOQs. Cost impacts are calculated instantly upon any drawing revision.
SERCOP public tenders: Bid documents and award records kept against the resulting project.
Learn more →Automate your tender process. Vendors submit quotes directly into your secure portal, and the system generates instant comparison sheets (CS).
IVA fields: Ecuadorian VAT fields on purchase orders and bills, set up with your accounts team.
Learn more →Track fabrication progress from raw material to dispatch using barcode scanning on the shop floor. Eliminate lost paper cards.
Planillas de obra: Progress billings prepared from measured quantities with retention shown.
Learn more →Remove email bottlenecks. Set up logic-based workflow chains that ping directors on their phones for 1-click financial sign-offs.
Remote Amazon sites: Supervisors log progress from remote sites.
Learn more →Stop building off outdated blueprints. Centralize all drawing revisions with strict version control and instant distribution to site teams.
Learn more →Maximize equipment utilization. Track crane and excavator allocation, fuel logs, and maintenance across multiple sites in real-time.
Learn more →In Ecuador, project demand comes from oil fields in the Oriente, refining, mining, ports and industry. The modules are shared; what changes is the sequence of approvals, measurement and billing for each industry.
Design, procurement and site execution on one thread
See the workflow →Job cards, shop floor and dispatch tracked end to end
See the workflow →BOQ, site stores and contractor billing that reconcile
See the workflow →Engagements, timesheets and deliverables billed cleanly
See the workflow →Survey to commissioning milestones, tracked
See the workflow →Maintenance, AMC and asset lifecycle in one register
See the workflow →Packages, inspection records and shutdowns on one traceable thread
See the workflow →Submittals, site stores and subcontractor bills that reconcile
See the workflow →Treatment plants and pipelines tracked from design to trial run
See the workflow →Capital projects and shutdowns planned around material and manpower
See the workflow →Send us your current Excel sheets and approval chain. We will show how it would be set up for your projects.
We deploy tailored modules in weeks, set up around Norma Ecuatoriana de la Construcción (NEC), INEN standards, Operator HSE and vendor requirements.
We map your current Excel/WhatsApp workflow exactly as it is.
We adapt our core framework to match your terminology and phases.
Your team tests a live version with real project data.
Full deployment and training for your engineering teams.
Quality-gated 7-stage process shaped around your exact operational SOPs. Inspect working software continuously and give written sign-off before invoice release.
The scope is agreed in writing before development starts.
You approve each stage against the acceptance criteria agreed up front, before the next milestone.
Traditional tools create data silos, unapproved revisions, and delayed site reconciliations. Here is how engineering firms transform their daily operations.
Manual re-entry when drawings revise. Quantity take-offs get desynchronised and outdated immediately.
Unstandardised quote sheets buried across personal emails and WhatsApp threads. Zero single-source rate history.
Verbal nods, chat messages, and informal emails without a binding sign-off hierarchy or revision timestamp.
Paper job cards and disconnected status reports with no weight verification or milestone links.
Rigid generic SaaS forms or fragile custom Excel formulas that break when teams expand.
Quantities automatically track the current revision baseline with instant differential takeoff logs.
Normalized vendor item rates, commercial evaluation sheets, and locked award records tied to drawings.
Role-based approval gating, digital sign-offs, and immutable audit logs preventing unapproved changes.
Live workshop progress, unit/weight validation, and daily milestone tracking connected to billing.
Configured strictly around your industry phases, nomenclature, and ISO quality standards.
Switching from WhatsApp and Excel to a centralized software is a big leap for any engineering firm. We have compiled the most common concerns about cost, data migration, and field-worker adoption.
Our lead engineers can answer your technical workflow questions directly. No sales pitch, just solutions.
Email usBid and award documents attach to the resulting project.
Billings are prepared from measured quantities with retention shown.
Each job lists materials, contractors and permits and shows readiness.
Yes. Tax fields for Ecuador can be added to purchase orders and bills during configuration, so documents show the rate and registration details your accounts team uses. Final treatment stays with your tax advisers.
Cities we serve across Ecuador.
Real feedback from enterprise clients and partners on Google Maps. Hover over any card to pause.
Send us your process or messiest Excel sheet. We'll map it to a custom software architecture for free.
Call Us Directly
+91 7600 907 288Send an Email
info@nntsoftware.comOffice Hours
Mon - Sat: 9:00 AM to 6:00 PM
3rd Floor, Diamond Complex, SH 41,
Industrial Area, Chhapi, Gujarat, 385210