Energy & Renewables Software in IndiaStop losing margin to commissioning delays in India.
When supply delays only surface on installation day, projects bleed money. We provide early warning systems from survey to grid-sync.

for your workflow
Built specifically for the Energy & Renewables sector.
What is Energy & Renewables project management software in India?
Energy project management software tracks a project from site survey and sizing through procurement, installation and commissioning, with supply dates linked to the installation schedule so slips are visible early.
Energy & Renewables in India
Solar and wind projects in India run under SECI, state utility or commercial and industrial contracts, each with its own milestones. NNT tracks survey, supply and commissioning per site against those milestones.
The precise sequence we build for Energy & Renewables.
These stages are the standard baseline for your industry. Every step is renamed, reordered, or removed during onboarding to match your exact SOP.
Site survey
Custom configured module and dashboard.
BoM sizing
Custom configured module and dashboard.
RFQ
Custom configured module and dashboard.
Supply
Custom configured module and dashboard.
Installation
Custom configured module and dashboard.
Commissioning
Custom configured module and dashboard.
Quality Gate: You sign off on this mapped workflow blueprint before a single screen is configured for your team.
We fix the problems nobody talks about.
Direct integration of field survey mobile data into the central design repository, ensuring BOQs are generated from actual site realities.
Site survey records
Configured to your energy workflow and approval chain.
BoM & sizing
Configured to your energy workflow and approval chain.
Vendor RFQ
Configured to your energy workflow and approval chain.
Delivery tracking
Configured to your energy workflow and approval chain.
Install milestones
Configured to your energy workflow and approval chain.
Commissioning checks
Configured to your energy workflow and approval chain.
Records, standards and roles in Energy & Renewables in India
The records below are what a typical energy team keeps and is asked to produce. The standards are the ones these records commonly relate to; NNT holds the records that demonstrate compliance, and the exact set is configured to your own procedures and your client's requirements.
Records it keeps
- Site survey records
- System sizing and BOM
- Supplier delivery tracking
- Installation milestones
- Commissioning and test checklists
Standards it commonly supports
- IEC 62446 documentation and commissioning tests for grid-connected PV systems
- Local grid-connection and utility requirements
- ISO 45001 occupational health and safety records
Roles that use it
- Project manager
- Design engineer
- Procurement lead
- Site supervisor
- Commissioning engineer
Other industries we serve
Same modules, configured to a different sequence. Open any industry to see exactly what changes.
Consultancy & Professional Services
Engagements, timesheets and deliverables billed cleanly
Oil, Gas & Petrochemical
Packages, inspection records and shutdowns on one traceable thread
You probably have questions.
Switching from WhatsApp and Excel to a centralized software is a big leap for any engineering firm. We have compiled the most common concerns about cost, data migration, and field-worker adoption.
Still have a specific doubt?
Our lead engineers can answer your technical workflow questions directly. No sales pitch, just solutions.
Email usIt tracks a solar or renewable project from survey and design through procurement, installation and commissioning, linking supplier delivery dates to the installation plan and holding the commissioning records.
Yes. Each site follows the same milestone template, and a portfolio view shows which sites are on plan and which are at risk. Fully compatible with regional operational and compliance standards in India.
Yes. Site types are configured as separate project templates, each with its own stage sequence and checklist.
Yes. Survey entries, checklist results and progress updates work from a phone browser at site.
Each vendor package has committed dates with actual tracking, so the record shows who caused a delay.
Supply, installation and commissioning are milestone stages with committed dates, so a slip shows up as a red stage weeks before the commissioning date, not on the day.
A revised BoM is raised as a version, the delta is priced and approved, and the project plan updates from that point — the old sizing is never silently overwritten.
Survey records are attached to the design they informed, so a later design revision flags the survey items that need re-checking.
Global Presence
Cities we serve across India.
Tagged with
Trusted by Engineering & Industry Leaders
Real feedback from enterprise clients and partners on Google Maps. Hover over any card to pause.
Let's talk workflow.
Send us your process or messiest Excel sheet. We'll map it to a custom software architecture for free.
Call Us Directly
+91 7600 907 288Send an Email
info@nntsoftware.comOffice Hours
Mon - Sat: 9:00 AM to 6:00 PM
3rd Floor, Diamond Complex, SH 41,
Industrial Area, Chhapi, Gujarat, 385210