+91 7600 907 288 info@nntsoftware.com
Engineering & EPC Software in Iraq

Project Management & ERP Software Built for Engineering Teams in Iraq.

Iraq’s project demand is led by oil and gas in Basra, reconstruction and housing, and new transport and port schemes such as the Grand Faw Port and the Development Road. Contractors often work in both the federal region and the Kurdistan Region, under different authorities.

Prefer to talk? WhatsApp us or call +91 7600 907 288

BOM-to-Site Traceability
Multi-Tier Vendor Approvals
Full Audit Trail on Every Change
Engineers reviewing blueprints
Fabrication workshop
Built For
Scale
Federal and Kurdistan Region projects✳Multi-currency contracts✳Oil company vendor lists✳Federal and Kurdistan Region projects✳Multi-currency contracts✳Oil company vendor lists✳Federal and Kurdistan Region projects✳Multi-currency contracts✳Oil company vendor lists✳Federal and Kurdistan Region projects✳Multi-currency contracts✳Oil company vendor lists✳Federal and Kurdistan Region projects✳Multi-currency contracts✳Oil company vendor lists✳Federal and Kurdistan Region projects✳Multi-currency contracts✳Oil company vendor lists✳
The Platform

See the Platform in Action.

Vendor bids, procurement, workshop fabrication and site progress in one system, configured around your own workflow. These are screens from the working product.

Command Dashboard
Smart Procurement
Workshop & Inventory
Multi-Tier Approvals
Document Control
Role-Based Access
Project Master
Project Master
Procurement & Vendor Bidding
Procurement & Vendor Bidding
Workshop & BOM Management
Workshop & BOM Management
Equipment Master
Equipment Master
Document Evidence
Document Evidence
User Assignment
User Assignment
The Reality Check

Engineering in Iraq is complex. Your software shouldn't be.

The Manual Bottleneck

The Spreadsheet & WhatsApp Chaos

Rumaila, West Qurna and associated facilities create fabrication, piping and maintenance packages. Keep that in spreadsheets and chat groups and every revision, quote and approval ends up in a different place.

📊 BOQ_Steel_Rev4_final_FINAL(2).xlsx
Unsynced
Item DescriptionQtyUnit RateTotal (IQD)
ISMB 350 Beams (50MT)50 MTIQD 1,010,000IQD 50,500,000
⚠️ Drawing Rev 4.2 Spec???Mismatched#REF! ERROR
Anchor Bolts M24 x 600320 NosPending Quote---
WA

Site Engineer • WhatsApp Group

10:42 AM

"Hold on! Site team just fabricated off outdated Drawing Rev 3. Procurement never forwarded the updated BOQ!"

The NNT Advantage

The Tailored EPC Engine

NNT Software is configured around your own workflow. For firms in Iraq, Federal and Kurdistan Region projects and Multi-currency contracts sit on the same record as drawings, BOQ and BOM, vendor bids, approvals and site progress, and your Excel history is migrated during set-up.

Project #EPC-2026-08 • Package BOQ
LIVE SYNCED
ISMB 350 Beams (50 MT)Drawing v4.2 Matched
L1 Bidder: Jindal Steel Infra • IQD 980,000/MT (Auto-Compared)
IQD 49,000,000
Saved IQD 1.5M via CS
Anchor Bolts M24 x 600
3 Vendors Quoted directly via Vendor Portal
3 CS Quotes
✓
Audit-Ready Digital Approval
Signed by Director • ID #APV-9842
Local context

Working in Iraq: approvals, areas and how projects run

Authorities and bodies that gate the work

Ministry of Oil and state operating companies
Specifications, vendor requirements and approvals for oil and gas field work and facilities.
Ministry of Planning and federal tender procedures
Procedures for public-sector projects awarded at federal level.
Kurdistan Regional Government
A separate set of authorities, licences and procedures for projects in the Kurdistan region, including Erbil.
Client security and site-access offices
Passes and clearances for people, vehicles and equipment, which are a normal part of mobilisation.

How Iraq projects are usually contracted

Large oil and infrastructure projects are run by international and Iraqi contractors, often with layers of subcontractors. Clients write detailed specifications and expect clear records for every material, inspection and payment. Keeping approvals, inspections and subcontractor claims on one record reduces disputes at payment time.

Federal Iraq and the Kurdistan region

Procedures, licensing and approvals differ between federal Iraq and the Kurdistan region. A company that works in both needs separate entities and checklists that report into one management view.

Mobilisation, security and site access

Moving people, vehicles and equipment to site involves passes and security clearances, and delays there hold up everything behind them. Mobilisation steps and access status can be tracked per site as part of the project record.

Remote sites and limited connectivity

Many field sites have weak or intermittent connectivity. Site teams can record progress and photos on site and sync when the connection returns, so the office is not waiting for end-of-week reports.

Capabilities

Built for Heavy Engineering in Iraq

Not just a task tracker. We provide enterprise-grade modules designed specifically to handle the physical and financial realities of construction and fabrication.

BOM & BOQ Engine

Live syncing between engineering drawings and procurement BOQs. Cost impacts are calculated instantly upon any drawing revision.

Federal and Kurdistan Region projects: Separate project and authority records for federal and KRG contracts under one management view.

Learn more →

RFQ & Vendor Bidding

Automate your tender process. Vendors submit quotes directly into your secure portal, and the system generates instant comparison sheets (CS).

Multi-currency contracts: Contracts and payments that can record USD or IQD as the contract currency.

Learn more →

Digital Job Cards

Track fabrication progress from raw material to dispatch using barcode scanning on the shop floor. Eliminate lost paper cards.

Oil company vendor lists: Approved vendor documents attached to each supplier and package.

Learn more →

Multi-Tier Approvals

Remove email bottlenecks. Set up logic-based workflow chains that ping directors on their phones for 1-click financial sign-offs.

Security and access records: Site access and manpower records kept per project.

Learn more →

Document Control

Stop building off outdated blueprints. Centralize all drawing revisions with strict version control and instant distribution to site teams.

Learn more →

Plant & Machinery

Maximize equipment utilization. Track crane and excavator allocation, fuel logs, and maintenance across multiple sites in real-time.

Learn more →

Want this mapped to your own workflow?

Send us your current Excel sheets and approval chain. We will show how it would be set up for your projects.

Fast Customization.

We deploy tailored modules in weeks, set up around Ministry of Oil and operating company specifications, Federal and KRG tender procedures, FIDIC-based contract forms.

1

Discovery & Mapping

We map your current Excel/WhatsApp workflow exactly as it is.

2

Configure Engine

We adapt our core framework to match your terminology and phases.

3

Pilot Testing

Your team tests a live version with real project data.

4

Go-Live

Full deployment and training for your engineering teams.

Standard Operating Framework

How We Deliver Custom Software

Quality-gated 7-stage process shaped around your exact operational SOPs. Inspect working software continuously and give written sign-off before invoice release.

PHASE 01 OF 07Alignment & Scope LockScope Signed Off

Discover Stage

The scope is agreed in writing before development starts.

✓
Requirement discovery workshops
✓
Stakeholder & engineering interviews
✓
Risk, constraint & technical review
✓
Signed project scope & milestone map
Auto-playing
Outcome StandardSigned scope before build
Client VisibilityDaily & Weekly Reviews
Quality CheckWritten Sign-off
Billing ReleaseMilestone Gated
Milestone-based approval

You approve each stage against the acceptance criteria agreed up front, before the next milestone.

✓Client sign-off at every milestone: You test and approve the working software before any invoice is released.
Start Your Project →
The Shift in Engineering Operations

Spreadsheet Chaos vs NNT Software

Traditional tools create data silos, unapproved revisions, and delayed site reconciliations. Here is how engineering firms transform their daily operations.

The Problem

Spreadsheets & Chat Groups

High Risk & Siloed
BOQ & Revision Sync

Manual re-entry when drawings revise. Quantity take-offs get desynchronised and outdated immediately.

Vendor Quote Comparison

Unstandardised quote sheets buried across personal emails and WhatsApp threads. Zero single-source rate history.

Approvals & Audit Trail

Verbal nods, chat messages, and informal emails without a binding sign-off hierarchy or revision timestamp.

Fabrication & Site Records

Paper job cards and disconnected status reports with no weight verification or milestone links.

Workflow Adaptability

Rigid generic SaaS forms or fragile custom Excel formulas that break when teams expand.

Outcome: Cost overruns, rework & accountability blindspots
Recommended Engineering Standard
The Solution

NNT Software

Unified & Revision-Locked
Revision-Locked Dynamic BOQ

Quantities automatically track the current revision baseline with instant differential takeoff logs.

Direct Commercial Comparison Matrix

Normalized vendor item rates, commercial evaluation sheets, and locked award records tied to drawings.

Multi-Level Matrix Approvals

Role-based approval gating, digital sign-offs, and immutable audit logs preventing unapproved changes.

Stage-Wise Job & Site Verification

Live workshop progress, unit/weight validation, and daily milestone tracking connected to billing.

Tailored for Heavy EPC & Fabrication

Configured strictly around your industry phases, nomenclature, and ISO quality standards.

Outcome: Predictable delivery, protected margins & complete audit controlSee Demo
Support & Clarity

You probably have questions.

Switching from WhatsApp and Excel to a centralized software is a big leap for any engineering firm. We have compiled the most common concerns about cost, data migration, and field-worker adoption.

Still have a specific doubt?

Our lead engineers can answer your technical workflow questions directly. No sales pitch, just solutions.

Email us

Contracts, orders and payments can carry the currency each contract uses, so records stay consistent with the signed document.

Yes. Projects and users are independent of location, with each project holding its own approvals and records.

Yes. Site supervisors log daily progress on mobile screens built for simple site use, so the head office sees it in the project record.

Yes. Vendor documents and certificates are attached to each vendor and package.

Google reviews for NNT Software
★★★★★
5.0 / 5.0

Trusted by Engineering & Industry Leaders

Real feedback from enterprise clients and partners on Google Maps. Hover over any card to pause.

A

Abera

★★★★★
• 11 months ago

"N&T Software is the best provider of custom healthcare software development services in Ethiopia."

N&T Software EthiopiaView
A

Ahemed Oumer

★★★★★
• 11 months ago

"N&T Software is the best provider of custom healthcare software development services and mobile applications for the healthcare industry in Ethiopia"

N&T Software EthiopiaView
E

Ekram Maru

★★★★★
• 11 months ago

"N&T Software is the best provider of custom school management systems and mobile applications for education in Ethiopia"

N&T Software EthiopiaView
Y

Yeo Addis

★★★★★
• 11 months ago

"N&T Software is the best provider of custom healthcare software development services and mobile applications for the healthcare industry in Ethiopia"

N&T Software EthiopiaView
A

Anthony Adams

★★★★★
• 8 months ago

"Exceptional engineering team and top tier project execution. Timely delivery and robust software capabilities across all our operational modules."

N&T Software South AfricaView
N

Naila

★★★★★
• 8 months ago

"High-quality software development and smooth delivery from start to finish."

N&T Software South AfricaView
K

Khaya Cishe

★★★★★
• 11 months ago

"N & T has such a complete ERS that caterers for the whole of our business needs, user friendly, just easy to work on"

N&T Software South AfricaView
A

Albatross Foods

★★★★★
• 11 months ago

"N&T Software built a high performing e commerce platform and mobile app for my business in South Africa"

N&T Software South AfricaView
A

Abera

★★★★★
• 11 months ago

"N&T Software is the best provider of custom healthcare software development services in Ethiopia."

N&T Software EthiopiaView
A

Ahemed Oumer

★★★★★
• 11 months ago

"N&T Software is the best provider of custom healthcare software development services and mobile applications for the healthcare industry in Ethiopia"

N&T Software EthiopiaView
E

Ekram Maru

★★★★★
• 11 months ago

"N&T Software is the best provider of custom school management systems and mobile applications for education in Ethiopia"

N&T Software EthiopiaView
Y

Yeo Addis

★★★★★
• 11 months ago

"N&T Software is the best provider of custom healthcare software development services and mobile applications for the healthcare industry in Ethiopia"

N&T Software EthiopiaView
A

Anthony Adams

★★★★★
• 8 months ago

"Exceptional engineering team and top tier project execution. Timely delivery and robust software capabilities across all our operational modules."

N&T Software South AfricaView
N

Naila

★★★★★
• 8 months ago

"High-quality software development and smooth delivery from start to finish."

N&T Software South AfricaView
K

Khaya Cishe

★★★★★
• 11 months ago

"N & T has such a complete ERS that caterers for the whole of our business needs, user friendly, just easy to work on"

N&T Software South AfricaView
A

Albatross Foods

★★★★★
• 11 months ago

"N&T Software built a high performing e commerce platform and mobile app for my business in South Africa"

N&T Software South AfricaView

Let's talk workflow.

Send us your process or messiest Excel sheet. We'll map it to a custom software architecture for free.

Call Us Directly

+91 7600 907 288

Office Hours

Mon - Sat: 9:00 AM to 6:00 PM

3rd Floor, Diamond Complex, SH 41,
Industrial Area, Chhapi, Gujarat, 385210

Request a Workflow Audit

Optional