Project Management & ERP Software Built for Engineering Teams in Turkey.
Turkish contractors are among the largest international contractors, with large portfolios across the Middle East, Africa and Central Asia. At home, Kocaeli, Mersin and İskenderun support petrochemical, steel and port projects, while Istanbul and Ankara drive commercial and infrastructure construction.
Vendor bids, procurement, workshop fabrication and site progress in one system, configured around your own workflow. These are screens from the working product.
Command Dashboard
Smart Procurement
Workshop & Inventory
Multi-Tier Approvals
Document Control
Role-Based Access
Project Master
Procurement & Vendor Bidding
Workshop & BOM Management
Equipment Master
Document Evidence
User Assignment
The Reality Check
Engineering in Turkey is complex. Your software shouldn't be.
The Manual Bottleneck
The Spreadsheet & WhatsApp Chaos
Turkish firms run projects in the Gulf, Africa and Central Asia from Istanbul and Ankara. Keep that in spreadsheets and chat groups and every revision, quote and approval ends up in a different place.
📊 BOQ_Steel_Rev4_final_FINAL(2).xlsx
Unsynced
Item Description
Qty
Unit Rate
Total (TRY)
ISMB 350 Beams (50MT)
50 MT
₺26,500
₺1,325,000
⚠️ Drawing Rev 4.2 Spec
???
Mismatched
#REF! ERROR
Anchor Bolts M24 x 600
320 Nos
Pending Quote
---
WA
Site Engineer • WhatsApp Group
10:42 AM
"Hold on! Site team just fabricated off outdated Drawing Rev 3. Procurement never forwarded the updated BOQ!"
VS
The NNT Advantage
The Tailored EPC Engine
One record, set up your way: drawings and revisions, BOQ and BOM, vendor bidding and approvals, with International project management and Hakediş progress payments handled the way Turkey clients expect. Work tied to overseas contracting is tracked against the same project.
Project #EPC-2026-08 • Package BOQ
LIVE SYNCED
ISMB 350 Beams (50 MT)Drawing v4.2 Matched
L1 Bidder: Jindal Steel Infra • ₺25,600/MT (Auto-Compared)
₺1,280,000
Saved ₺45,000 via CS
Anchor Bolts M24 x 600
3 Vendors Quoted directly via Vendor Portal
3 CS Quotes
✓
Audit-Ready Digital Approval
Signed by Director • ID #APV-9842
Local context
Working in Turkey: approvals, areas and how projects run
Authorities and bodies that gate the work
Municipalities (yapı ruhsatı)
Building permits.
Building inspection companies
Mandatory independent inspection of building works.
Public Procurement Authority and EKAP
Rules and platform for public tenders.
Ministry of Environment, Urbanisation and Climate Change
Planning, environmental and earthquake-related requirements.
Revenue Administration
VAT (KDV) and e-invoice requirements.
Overseas contracting from Turkey
Turkish contractors build abroad in many countries and manage sites from Istanbul and Ankara. Each project has its own currency, tax and approval rules. Projects are configured per country, with the head office comparing them.
Earthquake-resistant construction
Turkey’s earthquake risk means inspection and structural documentation matter. Inspection findings are logged with owner and due date and closed with evidence.
Price escalation in contracts
High inflation makes price-difference clauses (fiyat farkı) important. Index values and applied differences are recorded per contract, so escalation claims have support.
Reconstruction programmes
Housing and reconstruction schemes repeat unit designs in large numbers. Unit progress and snag lists are tracked.
Capabilities
Built for Heavy Engineering in Turkey
Not just a task tracker. We provide enterprise-grade modules designed specifically to handle the physical and financial realities of construction and fabrication.
BOM & BOQ Engine
Live syncing between engineering drawings and procurement BOQs. Cost impacts are calculated instantly upon any drawing revision.
International project management: Projects in several countries and currencies managed from an Istanbul head office.
Learn more →
RFQ & Vendor Bidding
Automate your tender process. Vendors submit quotes directly into your secure portal, and the system generates instant comparison sheets (CS).
Hakediş progress payments: Progress payments prepared from measured work with retention shown.
Learn more →
Digital Job Cards
Track fabrication progress from raw material to dispatch using barcode scanning on the shop floor. Eliminate lost paper cards.
KDV fields: Turkish VAT fields on purchase orders and invoices, set up with your accounts team.
Learn more →
Multi-Tier Approvals
Remove email bottlenecks. Set up logic-based workflow chains that ping directors on their phones for 1-click financial sign-offs.
Turkish and English documents: Registers with titles in both languages.
Learn more →
Document Control
Stop building off outdated blueprints. Centralize all drawing revisions with strict version control and instant distribution to site teams.
Learn more →
Plant & Machinery
Maximize equipment utilization. Track crane and excavator allocation, fuel logs, and maintenance across multiple sites in real-time.
Learn more →
One platform, configured for how your industry works in Turkey
In Turkey, project demand comes from overseas contracting, petrochemicals and refining, steel and heavy industry, infrastructure and construction. The modules are shared; what changes is the sequence of approvals, measurement and billing for each industry.
We deploy tailored modules in weeks, set up around Turkish Standards (TS) and Eurocodes, Public procurement law and e-tender systems, Client and consultant specifications.
1
Discovery & Mapping
We map your current Excel/WhatsApp workflow exactly as it is.
2
Configure Engine
We adapt our core framework to match your terminology and phases.
3
Pilot Testing
Your team tests a live version with real project data.
4
Go-Live
Full deployment and training for your engineering teams.
Standard Operating Framework
How We Deliver Custom Software
Quality-gated 7-stage process shaped around your exact operational SOPs. Inspect working software continuously and give written sign-off before invoice release.
PHASE 01 OF 07Alignment & Scope LockScope Signed Off
Discover Stage
The scope is agreed in writing before development starts.
✓
Requirement discovery workshops
✓
Stakeholder & engineering interviews
✓
Risk, constraint & technical review
✓
Signed project scope & milestone map
Auto-playing
Outcome StandardSigned scope before build
Client VisibilityDaily & Weekly Reviews
Quality CheckWritten Sign-off
Billing ReleaseMilestone Gated
Milestone-based approval
You approve each stage against the acceptance criteria agreed up front, before the next milestone.
✓Client sign-off at every milestone: You test and approve the working software before any invoice is released.
Traditional tools create data silos, unapproved revisions, and delayed site reconciliations. Here is how engineering firms transform their daily operations.
The Problem
Spreadsheets & Chat Groups
High Risk & Siloed
BOQ & Revision Sync
Manual re-entry when drawings revise. Quantity take-offs get desynchronised and outdated immediately.
Vendor Quote Comparison
Unstandardised quote sheets buried across personal emails and WhatsApp threads. Zero single-source rate history.
Approvals & Audit Trail
Verbal nods, chat messages, and informal emails without a binding sign-off hierarchy or revision timestamp.
Fabrication & Site Records
Paper job cards and disconnected status reports with no weight verification or milestone links.
Workflow Adaptability
Rigid generic SaaS forms or fragile custom Excel formulas that break when teams expand.
Switching from WhatsApp and Excel to a centralized software is a big leap for any engineering firm. We have compiled the most common concerns about cost, data migration, and field-worker adoption.
Still have a specific doubt?
Our lead engineers can answer your technical workflow questions directly. No sales pitch, just solutions.
Projects, currencies and sites in several countries report into one record.
Payments are prepared from measured quantities with retention shown.
Registers hold both titles for a document.
Yes. Tax fields for Turkey can be added to purchase orders and invoices during configuration, so documents show the rate and registration details your accounts team uses. Final treatment stays with your tax advisers.