Project Management & ERP Software Built for Engineering Teams in South Africa.
South African engineering firms serve mines on the Witwatersrand and Bushveld, Sasol’s coal-to-liquids complexes at Secunda and Sasolburg, Eskom and independent power projects, and ports such as Richards Bay and Durban. Public works must be bid by CIDB-graded contractors, and clients routinely ask for B-BBEE evidence from suppliers.
CIDB grading✳B-BBEE certificates✳JBCC and NEC contracts✳CIDB grading✳B-BBEE certificates✳JBCC and NEC contracts✳CIDB grading✳B-BBEE certificates✳JBCC and NEC contracts✳CIDB grading✳B-BBEE certificates✳JBCC and NEC contracts✳CIDB grading✳B-BBEE certificates✳JBCC and NEC contracts✳CIDB grading✳B-BBEE certificates✳JBCC and NEC contracts✳
The Platform
See the Platform in Action.
Vendor bids, procurement, workshop fabrication and site progress in one system, configured around your own workflow. These are screens from the working product.
Command Dashboard
Smart Procurement
Workshop & Inventory
Multi-Tier Approvals
Document Control
Role-Based Access
Project Master
Procurement & Vendor Bidding
Workshop & BOM Management
Equipment Master
Document Evidence
User Assignment
The Reality Check
Engineering in South Africa is complex. Your software shouldn't be.
The Manual Bottleneck
The Spreadsheet & WhatsApp Chaos
Platinum, gold, coal and manganese operations depend on shutdown and fabrication contractors. Keep that in spreadsheets and chat groups and every revision, quote and approval ends up in a different place.
📊 BOQ_Steel_Rev4_final_FINAL(2).xlsx
Unsynced
Item Description
Qty
Unit Rate
Total (ZAR)
ISMB 350 Beams (50MT)
50 MT
R 14,500
R 725,000
⚠️ Drawing Rev 4.2 Spec
???
Mismatched
#REF! ERROR
Anchor Bolts M24 x 600
320 Nos
Pending Quote
---
WA
Site Engineer • WhatsApp Group
10:42 AM
"Hold on! Site team just fabricated off outdated Drawing Rev 3. Procurement never forwarded the updated BOQ!"
VS
The NNT Advantage
The Tailored EPC Engine
NNT Software is configured around your own workflow. For firms in South Africa, CIDB grading and B-BBEE certificates sit on the same record as drawings, BOQ and BOM, vendor bids, approvals and site progress, and your Excel history is migrated during set-up.
Project #EPC-2026-08 • Package BOQ
LIVE SYNCED
ISMB 350 Beams (50 MT)Drawing v4.2 Matched
L1 Bidder: Jindal Steel Infra • R 14,000/MT (Auto-Compared)
R 700,000
Saved R 25,000 via CS
Anchor Bolts M24 x 600
3 Vendors Quoted directly via Vendor Portal
3 CS Quotes
✓
Audit-Ready Digital Approval
Signed by Director • ID #APV-9842
Local context
Working in South Africa: approvals, areas and how projects run
Authorities and bodies that gate the work
CIDB
Contractor registration and grading, which limits the contract value a firm may tender for.
Local municipalities
Building plan approvals under the National Building Regulations.
Department of Employment and Labour
Occupational health and safety duties and construction regulations.
SARS
VAT and tax compliance on invoices and payment certificates.
Department of Mineral Resources and Energy
Mine health and safety requirements for contractors on mine sites.
CIDB grading decides what you can bid
A contractor’s CIDB grade limits tender value, and public clients check it. Registration status and grade are kept with the company, and tender and contract values are checked against it, so a bid is not prepared for a contract above the grade.
B-BBEE and local content in tenders
Tenders score B-BBEE status and subcontracting, and clients ask for certificates for suppliers. These expire. Certificates and ratings are recorded per vendor with expiry warnings, so supplier scoring can be shown at tender.
Load-shedding and site planning
Power interruptions affect workshops and sites. A plan that assumes continuous power slips. Workshop capacity and site calendars include power-related lost hours, and daily records support delay claims.
Mine shutdowns
Mining clients schedule shutdowns with fixed windows and strict safety rules. Materials, permits and inspections are linked to each shutdown task, so the planner can see readiness before the window opens.
JBCC, NEC and payment certificates
Public and private clients use JBCC, NEC or GCC forms, each with its own notices and payment steps. Contract forms are configured per project, with notice dates and certificate stages.
Capabilities
Built for Heavy Engineering in South Africa
Not just a task tracker. We provide enterprise-grade modules designed specifically to handle the physical and financial realities of construction and fabrication.
BOM & BOQ Engine
Live syncing between engineering drawings and procurement BOQs. Cost impacts are calculated instantly upon any drawing revision.
CIDB grading: Contractor grade and expiry tracked on company and subcontractor records.
Learn more →
RFQ & Vendor Bidding
Automate your tender process. Vendors submit quotes directly into your secure portal, and the system generates instant comparison sheets (CS).
B-BBEE certificates: Supplier certificates and levels kept against each vendor with expiry dates.
Learn more →
Digital Job Cards
Track fabrication progress from raw material to dispatch using barcode scanning on the shop floor. Eliminate lost paper cards.
JBCC and NEC contracts: Payment certificates and early-warning style notices tracked per contract form.
Learn more →
Multi-Tier Approvals
Remove email bottlenecks. Set up logic-based workflow chains that ping directors on their phones for 1-click financial sign-offs.
Shutdown job cards: Maintenance shutdown jobs tracked by material, labour and permit readiness.
Learn more →
Document Control
Stop building off outdated blueprints. Centralize all drawing revisions with strict version control and instant distribution to site teams.
Learn more →
Plant & Machinery
Maximize equipment utilization. Track crane and excavator allocation, fuel logs, and maintenance across multiple sites in real-time.
Learn more →
One platform, configured for how your industry works in South Africa
In South Africa, project demand comes from mining and mineral processing, power and renewables, petrochemicals, ports, rail and water. The modules are shared; what changes is the sequence of approvals, measurement and billing for each industry.
We deploy tailored modules in weeks, set up around SANS standards and the National Building Regulations, Occupational Health and Safety Act requirements, CIDB registration requirements.
1
Discovery & Mapping
We map your current Excel/WhatsApp workflow exactly as it is.
2
Configure Engine
We adapt our core framework to match your terminology and phases.
3
Pilot Testing
Your team tests a live version with real project data.
4
Go-Live
Full deployment and training for your engineering teams.
Standard Operating Framework
How We Deliver Custom Software
Quality-gated 7-stage process shaped around your exact operational SOPs. Inspect working software continuously and give written sign-off before invoice release.
PHASE 01 OF 07Alignment & Scope LockScope Signed Off
Discover Stage
The scope is agreed in writing before development starts.
✓
Requirement discovery workshops
✓
Stakeholder & engineering interviews
✓
Risk, constraint & technical review
✓
Signed project scope & milestone map
Auto-playing
Outcome StandardSigned scope before build
Client VisibilityDaily & Weekly Reviews
Quality CheckWritten Sign-off
Billing ReleaseMilestone Gated
Milestone-based approval
You approve each stage against the acceptance criteria agreed up front, before the next milestone.
✓Client sign-off at every milestone: You test and approve the working software before any invoice is released.
Traditional tools create data silos, unapproved revisions, and delayed site reconciliations. Here is how engineering firms transform their daily operations.
The Problem
Spreadsheets & Chat Groups
High Risk & Siloed
BOQ & Revision Sync
Manual re-entry when drawings revise. Quantity take-offs get desynchronised and outdated immediately.
Vendor Quote Comparison
Unstandardised quote sheets buried across personal emails and WhatsApp threads. Zero single-source rate history.
Approvals & Audit Trail
Verbal nods, chat messages, and informal emails without a binding sign-off hierarchy or revision timestamp.
Fabrication & Site Records
Paper job cards and disconnected status reports with no weight verification or milestone links.
Workflow Adaptability
Rigid generic SaaS forms or fragile custom Excel formulas that break when teams expand.
Switching from WhatsApp and Excel to a centralized software is a big leap for any engineering firm. We have compiled the most common concerns about cost, data migration, and field-worker adoption.
Still have a specific doubt?
Our lead engineers can answer your technical workflow questions directly. No sales pitch, just solutions.